Commercial

American General Insurance Group

To help increase energy efficiency and improve cooling power, we sequentially demolished, removed, and replaced cooling tower cells using cranes and derricks atop a 43-story building.

View Case Study

BP Three Eldridge Place

To accommodate a global company’s office expansion, we prefabricated all ductwork and piping for a 13-floor buildout within a tight schedule.

View Case Study

El Paso Energy

For El Paso Energy, we installed five energy-efficient chillers on time and within budget that helped significantly reduce electrical consumption, enabling a four-year project payback.

View Case Study

Southern Union Gas

Throughout a large natural gas company’s office space, we updated building control and plumbing systems to help lower operating costs and increase energy efficiency.

View Case Study