HOUSTON, TX
To complete a large HVAC retrofit for a 50-story office building, we demolished, removed, and replaced multizone HVAC systems and ductwork on all floors.
To help increase energy efficiency and improve cooling power, we sequentially demolished, removed, and replaced cooling tower cells using cranes and derricks atop a 43-story building.
To accommodate a global company’s office expansion, we prefabricated all ductwork and piping for a 13-floor buildout within a tight schedule.
For El Paso Energy, we installed five energy-efficient chillers on time and within budget that helped significantly reduce electrical consumption, enabling a four-year project payback.
Throughout a large natural gas company’s office space, we updated building control and plumbing systems to help lower operating costs and increase energy efficiency.